Phase One of the Study and Toilet Room Reno Is Done

This morning I put in the trim in the study:

There were four pieces total and the whole job was a nightmare. I had a hard time getting the right angles and I’d measure twice and still come up a foot short. At any rate, it’s DONE. The study isn’t really travel-ready right now, but what’s left is more organization than renovation, so I am considering phase one of the study renovation to be done.

Next on the list was the toilet room. I started by adding a threshold into the room:

I goofed when I did the Allure and needed a threshold at least 3” wide. A proper 3″ wide threshold with a beveled edge would have set me back about $20 while window planking was just $5. I hope I don’t stub my toes. 🙂

The shelf above the toilet needed a piece of trim and a tension rod:

Finally, I secured the pocket organizer with screws:

I want to put grommets in the bottom and secure it with screws also, but that’s low priority since the organizer is fine for travel the way it is. I therefore consider that phase one of the toilet room renovation is done.

There is soooooo much left to do!

Blog Widget by LinkWithinShare on Facebook
If you enjoyed this post, make sure you subscribe to my RSS feed!

1 Comment

Got anything to say? Go ahead and leave a comment!